Showing posts with label Climbers. Show all posts
Showing posts with label Climbers. Show all posts

Monday, October 17, 2011

Monday's Path

Ravens
The bright morning lights of Ravens Stadium.


Tide Point
Under Armor Headquarters at Tide Point.


Fort McHenry Rear Range Light Tower
Coast Guard light tower on Hull Street.


Climber on the Tower
Climber Gene Young makes the ascent.


Sunrays poke through the heavy cloud cover of Baltimore's harbor.


Mallards in the Harbor
Them R Ducks.


Tide Point
Tide Point with a sugar ship off-loading at Domino Sugars in the background.


Water Taxi
The water taxi "Alacrity", my new word for the day.





Self Supporting Tower Sunrays






The Moon at Tide Point
The old Proctor and Gamble logo on the Tide Point building opposite the moon.










Saturday, May 7, 2011

Powerline Training: Grounding De-Energized High Voltage Powerlines

Today we'll learn how to ground power lines safely. We are learning this in order to perform more cellular site work on powerline transmission towers.The tower on the left below is actually home to a cell site, in this case a "Cricket" cell site.The antennas are on the very top. These antennas are what makes talking on your cellphone possible. Once trained we can perform the necessary grounding, freeing up the power company workers and improving our business relationship with the power company.

The sun marks the tower for today's training.

Before work begins, the circuit switch blades must be opened to stop the flow of electrical power.

Opening the circuit to cut off power.

Grounding equipment is gone over by the instructors.


Orange flags are placed on the "live" side of the tower as a warning.


Climbers begin to ascend.


Ready for the equipment to be sent up.


A shotgun stick with ground clamps and leads is sent up.


The first of three circuits on the tower is grounded.


View from under the adjacent tower.


Rigging equipment.


Utilizing the shotgun stick under the watchful eye of an instructor.


2 out of 3 circuits grounded, one to go.


A climber with his glove bag containing his rubber sleeves, rubber gloves and leather gloves, all of which must be worn in addition to fire retardant clothing.


Too late, the day's work is done...


Friday, April 29, 2011

Monopole Tower Stack - Baltimore, Maryland

The 1st section arrives on site.

Anchor bolts in the caisson

Crane lifts the 1st section off the truck.
1st section rigged & lifted into position.

Holes are carefully lined up with the anchor bolts.

Nuts are tightened with a special wrench and a sledge hammer.

Smoothing things out for a better fit.

Climber goes up to de-rig the crane and await the next section.

Removing the rigging.
Next section lifted for inspection.

Climber awaits the next one.

Perfect fit!
Storm clouds, then BOOM!
Site supervisor shuts the job down for everyone's safety.
Storm passes and the jib is put on the crane for greater reach.
Two sections up and two to go.
3rd section guided into place.
Top section's 6 foot lightning rod, which we really don't need today.
Top section rigged and inspected.

The sun marks the spot.

Waiting for the last piece to fall into place.
Almost there...

New tower is up and a climber in a man basket is sent up to take measurements and snap some pictures.


Measuring tape reads an inch over 170 feet.

Baltimore's newest monopole!